GE ZFSB26D SS, ZFSB25D SS Connect Water Supply, Connect Power, Move Refrigerator Into Position

Page 7

Installation Instructions

Step 2A WATER LINE INSTALLATION WITH A REVERSE OSMOSIS SYSTEM

STEP 3 CONNECT WATER SUPPLY

Check to be sure that refrigerator power cord is not plugged into the wall outlet.

Skip this step when not using RO System

IMPORTANT:

When connecting to a GE reverse osmosis water system to your refrigerator, the GE RVKit must be used. For other reverse osmosis water systems, follow the manufacturer’s recommendations.

Tubing Clamp

1/4" Compression Nut

Ferrule (sleeve)

Refrigerator Connection

1/4" Tubing

SmartConnect™ Tubing

If the water supply to the refrigerator is from a Reverse Osmosis Water System, use the refrigerator’s filter bypass plug. Using the refrigerator’s water filtration cartridge with the RO filter can result in hollow ice cubes and slower water flow from the water dispenser.

Turn left to remove

Turn right to install bypass plug

If you are using copper tubing:

Place compression nut and ferrule (sleeve) onto the end of the tubing coming from the house water supply.

Insert the end of the copper tubing into the refrigerator connection at the back of the refrigerator, as far as possible. Hold the tubing in place and tighten the fitting.

If you are using GE SmartConnecttubing:

Insert the molded end of the tubing into the refrigerator connection, at the back of the refrigerator, and tighten the compression nut until it is hand tight.

Then tighten one additional turn with a wrench. Overtightening may cause leaks.

Fasten the tubing into the clamp provided to hold it in position. You may need to pry open the clamp.

Turn on the water at the shut-off valve to check for leaks.

STEP 4 CONNECT POWER

Connect refrigerator power cord plug to a properly grounded receptacle.

Check to make sure power to refrigerator is on by opening refrigerator door to see if interior lights are on.

STEP 5 MOVE REFRIGERATOR

INTO POSITION

Remove outside protective wrapping.

Move the refrigerator into final installation position.

Remove door spacer and all inside packaging.

7

Image 7
Contents Installation Instructions Before YOU Begin ContentsWater And Electrical Locations Product Dimensions ClearancesInstallation Space Additional Specifications Important Please read carefully Tools Required Flooring Materials Required Grounding the RefrigeratorMove Refrigerator Indoors Shut off the main water supply Install Water LineTo move the refrigerator indoors Against the truck onlyMove Refrigerator Into Position Connect PowerSkip this step when not using RO System Connect Water SupplyRollers have three purposes To Adjust the RollersLevel the Refrigerator Level the DoorsInstall Toekick Temperature ControlsStart Icemaker Page Page Pub. No Dwg. No D4577P001