Alto-Shaam Mobile Refrigerated Cart manual Scheduled Maintenance, Door Handle Replacement

Page 8
6.6DOOR HANDLE REPLACEMENT

SCHEDULED MAINTENANCE

6.6DOOR HANDLE REPLACEMENT

NOTE: It may be necessary to remove the handle assembly in order to get the cabinet through a door opening.

1.Remove the three side mounting screws in latch.

2.Remove two screws in strike.

3.Replace in reverse order.

6.7DOOR GASKET REPLACEMENT

NOTE: It is suggested that the door be removed from the cabinet and placed face down on a work table.

1.Remove the fasteners and pull old gasket from the retainer.

2.Clean gasket retainer and immediate area.

3.Start new gasket into retainer. After gasket is positioned, replace fasteners.

NOTE: Avoid cutting the gasket if possible.

6.8DOOR HINGE REPLACEMENT

NOTE: This procedure will require two people. One person to hold the door while the other removes the attachment screws.

1.Using a screwdriver, remove the three screws which attach the butt section of the hinges to the cabinet.

2.With the door detached from the cabinet, remove the screws which attach the second part of the hinge to the door.

3.To install the replacement hinge, reverse the process.

6.9POWER SWITCH REPL ACEMENT

1.Disconnect the unit from the power source.

2.Remove the silicone seal around the perimeter of the front control leader panel.

Remove the panel by lifting straight up.

3.Using a flat blade screwdriver remove the cover plate with switch attached.

4.Remove the wires connected to the switch.

5.Unscrew the lock washer and remove the switch.

6.Reverse the process to install the new switch

7. Remount the panel and reseal the silicone.

1000-MR2 (50HZ) OPERATION MANUAL #02/13

5/14

Image 8
Contents Model Installation Operation MaintenanceMobile Refrigerated Cart Double Compartment 1000-MR21000-MR2 Factory installed OptionsITEM NO mobile refrigerated cart220-240 net 557 ± 22 lbship 693 ± 22 lb 253 ± 10 kgALTO-SHAAM MOBIL E REFRIGERATED CARTS 3.0 START UP PROCEDURE3.1 SHUT-DOWN PROCEDURE 1.0 INTRODUCTION3.3 EXTENDED PERIOD OF INACTIVITY PROCEDURES3.4 ERROR CODES OPERATION / CLEANING 4.0 OPERATING PROCEDURE5.0 CLEANING and MAINTENANCE 5.1 CLEANINGSCHEDULED MAINTENANCE 6.0 MAINTENANCE6.1 MONTHLY INSPECTION & SERVICE 6.2 YEARLY INSPECTION & SERVICE6.6 DOOR HANDLE REPLACEMENT 6.7 DOOR GASKET REPLACEMENT6.8 DOOR HINGE REPLACEMENT 6.9 POWER SWITCH REPL ACEMENTCO RRECTIVE MAINTENANCE TROUBLE S HOOTING GUIDE SYMPTOMSSOLUTION POSSIBLE FAILURECO RRECTIVE MAINTENANCE TROUBLE SHOOTING GUIDE 7/148/14 MR2 SERVICE PARTS 10/14 11/14 Suction Line Discharge Line Electric Box COMPRESSOR FOR MR2 ELECTRICAL DIAGRAMPARTS IDENTIFICATION 13/14 Voltage Purchased From lIMIteD WarrantYtransPortatIon DaMaGe and claIMs