Perlick Official Manuals for Beverage Dispensers: Installation & Operation Guide

Page 3

Preparing the Cabinet – Flat Top Bottle Coolers

Uncrating and Inspection

Remove all crating material before operating. Carefully inspect cabinet for hidden damage.

If damage is discovered, file your claim immediately with the transport company. Perlick is not responsible for damage in transit.

Plumbing

No plumbing connections are required. Condensate from the cooling coil automatically evaporated through a condensate pan located in the condensing unit section.

Electrical

The cabinet must be connected to a separately fused power source (see Electrical Specification Plate) and grounded in accordance with National and Local Electrical Codes.

CAUTION: Do not attempt to operate the equipment on any other power source than that listed on the Electrical Specification Plate.

Placing the Cabinet

To assure maximum performance, fresh air must be allowed to circulate through the machinery compartment. It is important to allow at least two inches of clearance at the back or left end of the cabinet. Do not place anything in front of the cabinet that would obstruct air flow at these grilles. Do not place the unit in an unventilated small room.

CAUTION:

Removing the factory installed back clearance spacers without providing proper left side grill clearance for compressor air flow will void the warranty.

Cabinet should be leveled.

For sanitation purposes, it may be necessary to seal the base of the cabinet to the floor. This can be accomplished by laying a bead of silicone sealant along the base of the cabinet as shown by the figure below.

Adjustable Partitions

Perlick Bottle Coolers are provided with adjustable partitions which will accommodate various bottle sizes.

Remove bottles and cans from their cases before placing in cooler to ensure proper air flow.

On 2’ and 3’ models keep air intake open for proper circulation.

Installing Casters or Legs (optional)

Attach casters or legs to the cabinet bottom in holes provided. Use the supplied 14”–20 hex head self- tapping machine screws. If unit is tipped on its back for an extended period of time, wait 24 hours after unit is uprighted to plug the unit in.

CABINET

BEAD SILICON

SEALER (RTV)

FLOOR

Perlick is committed to continuous improvement. Therefore, we reserve the right to change specifications without prior notice.

3

Form No. Z2219

 

Rev. 4.15.06

Image 3
Contents Installation and Operation Instructions Sizes and Specifications, Flat Top Bottle Coolers Installation and Operating InstructionsPreparing the Cabinet Flat Top Bottle Coolers Cleaning the Cabinet How To Operate Flat Top Bottle CoolersTemperature Control Cleaning the Doors Cleaning the CondenserWiring Diagram Flat Top Bottle Coolers Replacement Parts Flat Top Bottle Coolers Model NOS Form No. Z2219