Zanussi GAS HOB manual Gas Connection, Cut Out Size, Building over a cupboard or drawer

Page 11

Gas Connection

Connection to the gas supply should be with either rigid or semi-rigid pipe, i.e. steel or copper.

The connection should be suitable for connecting to RC 1/2 (1/2 BSP male thread).

When the final connection has been made, it is essential that a thorough leak test is carried out on the hob and installation.

Ensure that the main connection pipe does not exert any strain on the hob.

It is important to install the elbow correctly, with the shoulder on the end of the thread, fitted to the hob connecting pipe.

Failure to ensure the correct assembly will cause leakage of gas.

Cut Out Size

The dimensions of the cut-out are given in the diagram.

FO 0814

 

 

 

 

A) End of shaft with nut

 

 

 

 

B) Washer

FO 0264

 

 

 

C) Elbow

Rectangular cut-out size for hob

 

 

 

 

 

 

 

min

.

 

 

55

 

 

 

 

 

 

47030

550

Dimensions are given in mm.

FO 2098

Building In

Building over a cupboard or drawer

If the hob is to be installed above a cupboard or drawer it will be necessary to fit a heat resistant board below the base of the hob on the underside of the work surface.

It is also recommended to carry out the electrical connection to the hob as shown in diagrams 1 and 2.

Building over a kitchen unit with door

Proper arrangements must be taken in designing the furniture unit, in order to avoid any contact with the bottom of the hob which can be heated when it is operated. The recommended solution is shown in diagram 3.

The panel fitted under the hob ("a") should be easily removable to allow easy access if technical assistance is needed. The space behind the kitchen unit ("b") can be used for connections.

 

 

 

1

 

 

ON/OFF SWITCH

 

 

FLEX

 

 

 

OUTLET

 

 

 

FO 0763

 

 

ON/OFF SWITCH

2

 

3

 

 

 

30

 

 

a

min

 

60

20

 

 

FLEX

 

b

 

 

 

 

OUTLET

 

 

 

FO 0764

FO 1013

 

 

Dimensions are given in mm.

11

Image 11
Contents GAS Hobs Important Safety Information Description of the Hob ContentsOperation Maintenance and CleaningSomething Not Working? Service and Spare PartsSymptom Solution Customer Care Department Guarantee ConditionsZanussi Service Force Midlands London & Eastanglia Engineers technical data Instructions for the InstallerLocation Important safety requirementsInstallation When the HOB is First InstalledBuilding over a cupboard or drawer BuildingGas Connection Cut Out SizeThis HOB Must be Earthed Electrical connectionsFitting the Hob into the worktop Permanent ConnectionCheck Wiring DiagramFault Finding Preliminary Electrical SystemsIgnition System / Gas Ignition Conversion from Natural Gas to LPG To adjust the gas rateCommissioning Customer Care