Aarrow Fires 4 installation manual Checklist, Final Check List

Page 22

FINAL CHECK LIST

CHECKLIST

Hearths, Fireplaces, Flues and chimneys

This checklist is to ensure hearths, fireplaces, flues and chimneys are satisfactory, and to show what you have done to comply with the

requirements of The Building Regulations 2000 Approved Document J 2002.

1.Building address, where work has been carried out.......................................................................................................................................

.........................................................................................................................................................................................................................

2.Identification of hearth, fireplace chimney or flue

3.Firing capability: solid fuel/gas/.

4.Intended type of appliance. State model and output.

5.Ventilation provisions for the appliance:

State type and area of permanently open vents.

6.Chimney or flue construction

a)State the type or make and whether new or existing.

b)internal flue size (and equivalent height, where calculated - natural draught gas appliances only).

c)If clay or concrete flue liners used confirm that they are correctly jointed with socket end uppermost and

state jointing materials used.

d)If an existing chimney has been refurbished with a new liner, type or make of liner fitted.

e)Details of flue outlet terminal and diagram reference.

Outlet Details:

Complies with:

f)Number and angle of bends.

g)Provision for cleaning and recommended frequency.

7. Hearth. Form of construction. New or existing?

8.Inspection and testing after completion Tests carried out by:

Tests and results

 

Flue

visual

inspection

sweeping

 

coring ball

 

smoke

 

Appliance (where included) spillage

I/we the undersigned confirm that the above details are correct. In my opinion, these works comply with the relevant requirements in Part J of Schedule 1 to the Building regulations.

Print name and title

....................................................................................................Profession

Capacity

Telephone

Address

Post code

Signed

Date

Registered membership of..(e.g. CORGI, OFTEC, HETAS, NACE, NACS)............................................

22

Acorn Multifuel Stoves

Image 22
Contents Acorn Copyright Contents Petroleum Coke Introduction Safety Principle of the FireCheck List AFS009ATechnical Data AcornCombustible Materials Installation General PrecautionsHearth AIR for Combustion HandlingFitting the Optional Floor Fixing KIT Installation Firebox Liner PanelsRemoval of the Throat Plate Grate Installation Multifuel GrateGrate BAR Replacement Assembling the GrateInstallation Fitting the Flue Outlet and HOT Plate Flues and ChimneysInstallation For ALL AppliancesInstallation Typical Rear Flue Outlet Installation Typical Metal Insulated Chimney System Water Connections Installation Instructions ADD in BoilersFitting Final Check Installation InstructionsAIR Inlet Controls Multi Purpose Operating Tool Operating InstructionsDisassemble Airwash Fire Door GlassFuel Types Adjusting the Door HingesRecommended Reading Burning Wood Lighting the FireExtended Burning Mixed FuelsDE Ashing OVER-FIRINGASH Removal ClinkerChimney Sweeping Annual MaintenanceCleaning Door GlassChecklist Final Check ListParts List Part Description Visual Aid AcornParts List Parts List Guarantee GuaranteeService Record Date of Visit Company Work Carried Out Signature’ve checked it and it’s O.K Final Factory Check List