Westinghouse mh10 owner manual Safety tips

Page 2

ETL-ES-Craftsman-WH10

Safety tips

OBSERVE THE FOLLOWING: READ AND SAVE THESE INSTRUCTIONS

WARNING: TO REDUCE THE RISK OF FIRE, ELECTRIC SHOCK, OR PERSONAL INJURY, MOUNT TO OUTLET BOX MARKED "ACCEPTABLE FOR FAN SUPPORT",

AND USE THE OUTLET SCREWS PROVIDED WITH THE OUTLET BOX. MOST OUTLET BOXES COMMONLY USED FOR THE SUPPORT OF LIGHTING FIXTURES

ARE NOT ACCEPTABLE FOR FAN SUPPORT AND MAY NEED TO BE REPLACED. CONSULT A QUALIFIED ELECTRICIAN IF IN DOUBT.

1.Installation work and electrical wiring must be done by qualified person(s) in accordance with all applicable codes and standards (ANSI/NFPA 70-1999), including fire-rated construction.

2.Use this unit only in the manner intended by the manufacturer. If you have any questions contact the manufacturer.

3.After making the wire connections, gently push connections into outlet box with wire nuts pointing up. The wires should be spread apart with the grounded conductor and the equipment-grounding conductor on one side of the outlet box and ungrounded conductor on the other side of the outlet box.

4.Before you begin installing the fan, switch power off at service panel and lock service disconnecting means to prevent power from being switched on accidentally. When the service disconnecting means cannot be locked, securely fasten a prominent warning device, such as a tag, to the service panel.

5.Be cautious! Read all instructions and safety information before installing your new fan. Review the accompanying assembly diagrams.

6.When cutting or drilling into wall or ceiling, do not damage electrical wiring and other hidden utilities.

7.Make sure the installation site you choose allows the fan blades to rotate without any obstructions. Allow a minimum clearance of 7 feet from the floor to the trailing edge of the blade.

8.To reduce the risk of fire, electric shock, or personal injury, this fan must be mounted to an outlet box marked suitable for fan support, and use the mounting screws provided with the outlet box. (Mounting must support at least 35 lbs.)

9.WARNING! Do not bend blade holders during installation to motor, balancing or during cleaning. Do not insert foreign object between rotating blades.

10.Attach the mounting bracket using only the hardware supplied with the outlet box. Fan is only to be mounted to an outlet box marked“Acceptable for Fan Support”.

11.WARNING! To reduce the risk of fire or electric shock, do not use this fan with any solid state fan speed control device, or variable speed control.

12.If this unit is to be installed over a tub or shower, it must be marked as appropriate for the application.

13.NEVER place a switch where it can be reached from a tub or shower.

14.The combustion airflow needed for safe operation of fuel-burning equipment may be affected by this unit’s operation. Follow the heating equipment manufacturer’s guideline safety standards such as those published by the National Fire Protection Association (NFPA), and the American Society for Heating, Refrigeration and Air Conditioning Engineers (ASHRAE) and the local code authorities.

15.Before servicing or cleaning unit, Switch power off at Service panel and lock service disconnecting means to prevent power from being switched on accidentally. When the service disconnecting means cannot be locked, securely fasten a prominent warning device, such as a tag, to the service panel.

16.All set screws must be checked and re-tightened where necessary before installation.

 

TOOLS REQUIRED

 

 

Phillips Screwdriver

Wire Cutters

Pliers

Step Ladder

2

Image 2
Contents Manual del usuario Safety tips Consejos de seguridad Features Características Varilla verticalFeatures PREPARING for installation Antes de la instalación Remove clamp pin 1 and cross pin 2 from downrod Normal Downrod Option Opción CON Varilla Vertical Para Cielorraso Normal Slide downrod ball 1 off of downrod and remove pin ETL-ES-Craftsman-WH10 Mounting Montaje Wiring Options Opción DE CableadoSecure To Ceiling Asegure el ventilador al cielorraso ETL-ES-Craftsman-WH10 Blade Installation Instalación de las paletas ETL-ES-Craftsman-WH10 Lift the glass 2 up placing it flush onto the light kit ETL-ES-Craftsman-WH10 OPEratiOn and MaintEnanCE OperationOPEraCión Y MantEniMiEntO FuncionamientoTrOUBLESHOOtinG GUidE GUía Para SOLUCiOnar PrOBLEMaS Westinghouse Lighting Corporation

mh10 specifications

The Westinghouse MH10 is a state-of-the-art nuclear reactor design that showcases advanced engineering and safety features, making it a significant innovation in the field of nuclear energy. As a pressurized water reactor (PWR), the MH10 is designed to provide a reliable and efficient source of energy, catering to both industrial and municipal needs.

One of the main features of the MH10 is its modular design, which allows for easier transportation, construction, and scalability. This reactor can be deployed in various configurations to meet the energy demands of different regions. The modularity not only reduces construction time but also enhances the adaptability of the reactor for various applications, from large-scale electricity generation to smaller, localized energy solutions.

The MH10 incorporates advanced safety technologies, such as passive safety systems that rely on natural processes like gravity and convection instead of active mechanical systems. This feature significantly reduces the risk of accidents by ensuring that the reactor can maintain safe conditions even in the event of a loss of power. Additionally, Westinghouse has integrated numerous redundancies to further enhance the safety and reliability of the reactor.

Another critical characteristic of the MH10 is its fuel efficiency. By utilizing advanced fuel technologies, the reactor maximizes energy output while minimizing waste generation. This aspect is increasingly important in today's environmentally-conscious energy landscape, as reducing nuclear waste is a priority for both operators and regulatory bodies.

Westinghouse's MH10 is also equipped with robust digital instrumentation and control systems. These systems provide real-time data on reactor performance and safety parameters, allowing for enhanced monitoring and predictive maintenance capabilities. Operators can make informed decisions quickly, ensuring the reactor operates within optimum parameters and addressing any potential issues before they escalate.

In terms of environmental impact, the MH10 is designed to operate with minimal emissions, aligning with global efforts to transition toward cleaner energy sources. The reactor produces low greenhouse gas emissions during its operation, making it an attractive option for governments and organizations aimed at reducing carbon footprints.

Overall, the Westinghouse MH10 represents a significant leap forward in nuclear reactor technology, spotlighting safety, efficiency, and adaptability. By integrating modular designs and advanced safety features, it positions itself as a vital player in the future of energy generation, meeting the growing demand for sustainable and reliable power solutions.