Jacuzzi Steam Enclosure installation instructions Plumb Each Jamb

Page 5

Step 4

Position the wall jambs on each end of the bath track with notches in the bottom of the jambs pressed securely over the bath track. Use a level to plumb each wall jamb. Make a pencil mark on the wall through each of the holes in the wall jamb. Remove all parts and drill the walls in the locations marked using an 1/8" diameter drill. In tile walls drill 7/32" diameter holes and insert plastic wall plugs.

PLUMB EACH JAMB

D

A

Step 5

Apply a continuous bead of caulking on the bottom of the bath track vinyl. Carefully replace the bath track in the position marked in Step 3. Slide the two pieces of jamb vinyl into the jamb filler. Replace the wall jamb closest to the shower head. The jamb filler should be installed with the opening closest to the interior of the bath. (This insures maximum waterproofing by position- ing the interior glass panel closest to the shower head.)

Attach the jamb and jamb filler to the wall with three #8 G x 1-1/2" truss head screws.

F

H

Step 6

Measure the wall to wall opening at the top of the mounted wall jamb. Cut the header 1/16" short of this measurement. Check the header for fit.

MEASURE

3

Image 5
Contents Steam Enclosure Responsibilities of others include Limited Warranty and RemedyPartslist a Bathtrack B Vinylplugs D Walljambs Step Plumb Each Jamb TEE-LOCK Step Jacuzzi Whirlpool Bath