6 SHELFTRACKOptionINSTALLATION OF HANG TRACK & STANDARDS
The Hang Track and Standards must be attached with screws to wall studs.
When using the Maximum Load Hang Track for installation,
the following weight load specifications apply:
•100 lbs. per laminate shelf
•50 lbs. per drawer
•Total weight per 40” Hang Track not to exceed 900 lbs. (Including the weight of each cabinet.)
•Total weight per 80” Hang Track not to exceed 1,900 lbs. (Including the weight of each cabinet.)
•Each standard should be secured with screws in all mounting holes.
Hang Track, Standards & Hardware sold separately. Use #12 x 2” pan head screw.
STUDS: Screw directly into studs.
CONCRETE: Drill 1/4” holes. Insert #12 wall anchors. Screw into place.
1 | 2 |
1. Locate the wall studs. Use a | 2. Hang the first Standard as |
level, then install the Hang Track to | shown, use a level, then attach the |
the studs with screws. | standard to the wall stud with |
| screws. |
6 SHELFTRACKOptionINSTALACIÓN DE RIELES DE COLGAR Y POSTES VERTICALES
El riel de colgar y los postes verticales deben instalarse con tornillos a los montantes verticales de la pared.
Al utilizar el riel de colgar de máxima carga para la instalación, se aplican
las siguientes especificaciones de carga de peso:
•100 libras por repisá
•50 libras por cajón
•El peso total por riel de 40" no debe exceder 900 libras (incluyendo el peso de cada gabinete).
•El peso total por riel de 80" no debe exceder 1,900 libras (incluyendo el peso de cada gabinete).
•Todos los postes verticales deben fijarse con tornillos en todos los orificios de montaje.
Los rieles, los postes verticales y los herrajes se venden por separado. Use tornillos #12 x 2" de cabeza alomada (pan head).
MONTANTES VERTICALES: Atorníllelos directamente en los montantes verticales.
CONCRETO: Taladre orificios de 1/4". Introduzca anclas #12 de pared. Atornille en posición.
1 | 2 |
1. Determine la ubicación de los mon- | 2. Cuelgue el primer poste vertical de la |
tantes. Utilice un nivel, después instale | manera mostrada, con ayuda de un nivel y |
con los tornillos el riel de colgar a los | luego instale con los tornillos al poste |
montantes verticales. | vertical a un montante vertical. |
3
Spacer Board
3.Use the spacer board and hang the second Standard from the Hang Track.
4
4.Hang the completed cabinet on the Standards. Make sure the hangers are "locked" into the slots on the Standards. Then attach the second Standard to the wall stud with screws as shown in Step 2.
3 | 4 |
Tabla separadora
3. Haga uso de la tabla separadora y | 4. Cuelgue el gabinete terminado, sin las |
cuelgue el segundo poste vertical en | puertas, en los postes verticales. |
el riel de colgar. | Cerciórese que los colgadores queden |
| insertados en las ranuras de los postes ver- |
| ticales. Después instale el segundo poste |
| vertical al montante vertical de la pared con |
| los tornillos indicados en el Paso 2. |
9