Husqvarna RZ4216 manual After the First 10 Hours, Hour Service

Page 52

 

SERVICE JOURNAL

 

 

 

 

 

 

 

Action

 

Date, mtr reading, stamp, sign

 

 

 

After the First 10 Hours

 

 

1. Change engine oil.

 

 

 

 

 

25-Hour Service

 

 

1.

Check the fuel pump’s air filter.

 

 

2.

Check the hydraulic system’s oil level.

 

 

3.

Check the tire pressures.

 

 

4.

Lubricate the belt adjuster, mower deck.

 

 

5.

Lubricate the belt adjuster, hydraulic pumps.

 

 

6.

Check/clean the engine’s cooling air intake.

 

 

7.

Clean air filter dust cap.

 

 

 

 

 

 

52

Image 52
Contents Operator Manual Husqvarna. All rights reserved Contents Page Introduction Good Service Manufacturing NumberSymbols and decals Remove key before Safety Instructions SafetyGeneral Operation Never take passengers Personal Safety Equipment Slope OperationChildren Safe Handling of Gasoline General Maintenance Risk of sparking Transport Spark ArrestorControls Control LocationsSteering Control Levers Parking Brake Ignition SwitchThrottle Control Choke Control RefuelingFuel Shut Off Valve Mower Deck Lifting LeverTracking Always use the high position F to transportBlade Control Lever Manual TransportTraining SteeringBefore Starting Starting the EnginePlace controls in neutral position Open the fuel valve Jumper cables To remove cables, reverse orderRunning Operating on Hills Mowing Tips Stopping the Engine Manual Transport Maintenance Maintenance ScheduleEvery 50 hours To clean battery and terminals BatteryAlways use protective glasses when handling the battery Safety System Tire PressuresDeck Belt BeltsTo replace deck belt EZT Belt Cutting BladesAdjusting the Mower Deck Leveling DeckCleaning Removal and installation of caster wheelUse protective glasses when cleaning and washing Caster WheelsLubrication GeneralFront Wheel Mount Front Wheel BearingsEngine Lubrication Steering Control ShaftsTroubleshooting Problem CauseTroubleshooting Service Winter StorageWiring Diagram Torque Specifications Technical DataStandard Hardware RZ4216 Engine TransmissionRZ4216 Equipment Overall dimensionsProductivity USA requirements CE requirementsDelivery Service Service JournalAction Date, mtr reading, stamp, sign Hour Service After the First 10 HoursService Journal At Least Once Each Year Service Journal Page 115 160926 R1 11/15/09