Contents
Main
installation and start-up instructions
TWO-SPEED PURON PLUS AIR CONDITIONING UNIT
598B
B
A
Page
Page
500 MINUTES
4500
4000
1500
CHECK FOR TIGHT, DRY SYSTEM (IF IT HOLDS DEEP VACUUM)
BREAK VACUUM WITH DRY NITROGEN WAIT
BREAK VACUUM WITH DRY NITROGEN
CHARGE SYSTEM
WAIT
Page
See notes 1, 2, 3, 6, 8, 10, and 12 A01495
CCC
W
G
Fig. 11Typical 24V Wiring Diagram
COOL STAGE 1 FAN HEAT STAGE 1 COOL STAGE 2 N/A 24 V A C HOT R
W/W1 Y/Y2 O/W2
Y2
G
See notes 1, 2, 3, and 5 A01501
24 V A C HOT 24 V A C COMM HEAT STAGE 1 COOL STAGE 2 FAN
HUM
R
W/W1 Y/Y2
Fig. 11Typical 24V Wiring Diagram (Cont)
WIRING DIAGRAM NOTES:
LEGEND
Page
Page
THERMISTOR CURVE
Page
Fig. 15Wiring Diagram024, 036, 048
Fig. 16Wiring Diagram060