Instruction manual ADM 15

is
3 Installation
Warning
Installation work should be carried out by an approved installation engineer
in compliance with the general and local regulations imposed by the gas, water
and power supply companies and the fire service.
The appliance may only be installed in a room that complies with the
requirements stated in national and local ventilation
regulations (1.3 "Regulations").
3.1 Introduction This chapter describes the installation activities to be carried out before the
appliance may be started up (9 "Starting and running"), in particular:
Packaging;
Ambient conditions;
Technical specifications;
Water connections, Vented;
Water connections, Vented;
Gas connection;
Chimney flue;
Electrical connection;
Checking the supply pressure and burner pressure.
For a possible conversion to a different gas category, see
conversion (4 "Conversion to a different gas category").
3.2 Packaging To avoid damaging the appliance, remove the packaging carefully.
We recommend unpacking the appliance at or near its intended location.
Caution
The appliance may only be manoeuvred in an upright position. Take care
that the appliance is not damaged after unpacking.
3.3 Ambient conditions Caution
The appliance may not be used in rooms where chemical substances are
stored or used, due to the risk of explosion and/or corrosion of the appliance.
Some propellants, bleaching agents, degreasing agents etc. disperse vapours
which are explosive and/or which cause accelerated corrosion. If the appliance
is used in a room in which such substances are present, the warranty will be
void.
ADM appliances are open appliances and may only be installed in an open
boiler room. Their type is B11BS.

3.3.1 Air humidity and ambient temperature

The boiler room must be frost-free, or be protected against frost. The table
shows the environmental conditions that must be adhered to for correct
functioning of the electronics present in the appliance to be guaranteed.