2.2.3Removing and replacing the inner door
(only for the EQB 115 and EQB 155 models, see Figure 7a). Procedure:
1.Place lip A through the recess on the right and subsequently slide it down behind the steel wall. See to it that both lower lips remain in front of the metal wall.
2.Press lip B through the recess on the left.
3.Subsequently slide lip B behind the steel wall (see Figure 7a).
(only for the EQB 200 model, see Figure 7b).
Procedure:
1.Turn down both clamps (1).
2.Place the entire door into the appliance and move the opening over the burner venturi.
3.Turn both clamps outward (3), pushing them over the edge of the burner chamber.
2.3Pilot adjustment
The pilot can be adjusted by means of the regulating screw under the plastic cover on the right hand side of the gas control block.
Turn the screw clockwise to reduce the gas pressure and anti clockwise to increase the pressure. Care should be taken to ensure the pilot covers the thermocouple element correctly
2.4Putting out of operation
1.For short periods of time the control knob should be turned to (✸); the pilot keeps burning.
2.For longer periods of time the knob should be turned to the (●) position; the pilot is extinguished.
3.Close the gas tap in the supply pipe. In case of longer interruptions or in the event of risk of frost it is
A
B
AOS 0520
Figure 7a - Mounting the inside door
3 | 3 |
1
1
IMD 0359
Figure 7b - Mounting the inside door
15