ADCP-61-471 • Issue 4 • June 2000 • Section 2: Operation and Maintenance

DLP-570

Page 3 of 18

4.Use the arrow or number keys to select Test Access Unit Commands. Press Enter or Return. The RTAU Configuration screen appears, as shown in Figure 570-3.

RTAU CONFIGURATION

1.RTAU Unit Configuration

2.User Pattern Definition

Press CONTROL-A For Assistance

14868-A

Figure 570-3. RTAU Configuration Menu

Note: The User Pattern Definition screen is not available for the MPU 5.3 release.

5.Use the arrow or number keys to select RTAU Unit Configuration from the RTAU Configuration menu. Press Enter or Return. The 'RTAU Config' screen appears, as shown in Figure 570-4.

Note: If the neither the RTAU or TAU are plugged into the chassis, the Test Access Unit Status/Commands screen, shown in Figure 570-5, can still be accessed from the System Maintenance menu. But in this case it cannot be configured.

However, if the TAU is plugged into the chassis, the Test Access Unit Status/Commands screen can be configured after accessing it from the System Maintenance menu. Refer to the Soneplex Test Access Unit Installation Instructions, listed under Related Publications at the beginning of this manual, for more information about the TAU.

6.To prepare the RTAU for operation, set the parameters shown on the 'RTAU Config' screen. Refer to Figures 570-6through 570-14for test diagrams and mode schematics. Refer to Table 570-1for details regarding parameter options. Use the arrow keys to move from field to field. Assign the selections by pressing Enter or Return.

2-213

© 2000, ADC Telecommunications, Inc.