Page 2 of 2
Do Items Below in The Order Listed | For Details Go To | |
7. | Clear Alarm History. | |
8. | Enter Target Identifier and set date and time now or during |
|
| provisioning (the | |
9. | Configure DS3 MUX as required. | |
10. | Configure RLX or RLXIOR modules as required. | |
11. | Check RLX voltage to repeater. | |
12. | Connect the test equipment at both ends of the system and perform |
|
| an | |
13. | If the DS3 MUX protect module is installed: |
|
| • Execute Force/APS commands through the Craft Interface. | |
| • Perform Manual (Force) Switch to Protect test on DS3 MUX |
|
| module. | |
| • Perform APS test on DS3 MUX module. | |
14. | At both ends of the circuit, make any necessary |
|
| the DSX. | |
15. | Log off from the Craft Interface system. | |
16. | Complete assignment forms and update office records as required |
|
| by local procedures. |
© 2000, ADC Telecommunications, Inc.