ADCP-61-471 • Issue 4 • June 2000 • Section 2: Operation and Maintenance

NTP-011

Page 2 of 2

Do Items Below in The Order Listed

For Details Go To

7.

Clear Alarm History.

DLP-527

8.

Enter Target Identifier and set date and time now or during

 

 

provisioning (the turn-up process).

DLP-528

9.

Configure DS3 MUX as required.

DLP-529

10.

Configure RLX or RLXIOR modules as required.

DLP-534or DLP-533

11.

Check RLX voltage to repeater.

DLP-567

12.

Connect the test equipment at both ends of the system and perform

 

 

an end-to-end test.

DLP-522

13.

If the DS3 MUX protect module is installed:

 

 

• Execute Force/APS commands through the Craft Interface.

DLP-537

 

• Perform Manual (Force) Switch to Protect test on DS3 MUX

 

 

module.

DLP-511

 

• Perform APS test on DS3 MUX module.

DLP-512

14.

At both ends of the circuit, make any necessary cross-connects at

 

 

the DSX.

DLP-569

15.

Log off from the Craft Interface system.

DLP-564

16.

Complete assignment forms and update office records as required

 

 

by local procedures.

DLP-523

2-26