Issue 1, November 1996
B. Rack Mounting the Wall Box
2.03The FTD1
C. Installing Wall Box Components
2.04Additional components available for use in the wall box include Hubbell connector kits, lower cable clamp kits, upper cable clamp kits; grounding kits; three splice trays, and a sheet of fiber designation labels.
Clamping OSP Cables
2.05OSP cables can be clamped to the wall box using a Hubbell connector kit and cable clamp assembly.
Hubbell Connector Kit
2.06The Hubbell connector kit (Figure 6) is installed
1.Using the cinch nut on the inside, mount the Hubbell connector in the upper or lower left corner of the wall box.
2.Remove the compression nut, split ring and bushing from the body of the Hubbell connector, then place them (in that order) over the end of the OSP cable onto the cable jacket.
3.Route the OSP cable through the Hubbell connector into the wall box, then strip the outer sheath of the end of the cable to expose the inner fibers or subunits.
4.After adjusting and clamping the OSP cable with a cable clamp kit (below), slide the compression nut, split ring and bushing up (or down) the cable and thread the compression nut onto the connector body and tighten it securely.
Page 7
© 1996, ADC Telecommunications, Inc.