5-Port 10/100/1000Mbps Gigabit Ethernet Switch User Guide
Unpacking | & | Installation |
| |||
This | chapter | provides | unpacking | and | ||
setup | information | for | the | Switch. | ||
U n p a c k i n g |
|
|
|
|
| |
Open | the shipping | carton | and | carefully | ||
unpack the | contents. | The | carton | contains | ||
the | following | items: |
|
|
|
•One
•One external power adapter
•Four rubber feet to be used for shock cushioning
•This User's Guide
If any item is missing or damaged, contact your local reseller for replacement.
Installation
The site where you install the Switch may greatly affect its performance. When installing, consider the following pointers:
•Install the Switch in a fairly cool and dry place. See Technical Specification for the acceptable operating temperature and humidity ranges.
•Install the Switch in a site free from strong electromagnetic source, vibration, dust, and direct sunlight.
•Leave at least 10cm of space at the left and right hand side of the Switch for ventilation.
•Visually inspect the DC power jack and make sure that
8 | AirLink101 |