Alcatel-Lucent 4760 manual Cost Savings, Time, Performance, Communication Enrichment, Optimization

Models: 4760

1 11
Download 11 pages 40.12 Kb
Page 3
Image 3
Thomas Markovic Director of engineering at the Park Hyatt

The solution is efficient, flexible, well-designedand reduces workload. This leads to significant time savings in our daily processes.

Thomas Markovic Director of engineering at the Park Hyatt

Cost Savings

Time

Optimization

O

Alcatel-Lucent

 

S

m

NM

 

niVista 4760

 

Performance

Communication

Enrichment

Page 3
Image 3
Alcatel-Lucent 4760 manual Cost Savings, Time, Performance, Communication Enrichment, Optimization, Alcatel-Lucent, niVista