OmniAccess 4324: Installation Guide
xii Part 031640-00 May 2005
Deployment Summary
This section outlines the various tasks involved in deploying the Alcatel
Wireless LAN solution, and indicates the document where you can find
appropriate instructions.
NOTEDocuments named below are included on the Alcatel Documentation
Library CD-ROM.
Physical installation of the Alcatel Wireless LAN Switch
Installation requires a trained technician who is experienced with handling and
installing similar equipment. This phase involves the following tasks:
zTransport, unpack, and mount the switch in a suitable rack environment.
zIf using a modular switch chassis, install any extra modules you may have
ordered.
zAttach power and a console.
zBoot the system and perform the initial power-on test, examining the LEDs
and console messages to ensure proper operation.
The Alcatel Wireless LAN Switch Installation Guides provide the necessary
instructions.
Initial configuration of the Alcatel Wireless LAN Switch
Configuration requires someone who understands the company's wired
network and has experience with the physical and logical management and
configuration of routers, switches, servers, and clients. This phase involves the
following tasks:
zUse the console to perform initial configuration of the Alcatel Wireless LAN
Switch.
zAttach the switch to the network.
The Alcatel Quick Start Guide provides instructions.
Planning the location of access points and air monitors
This phase requires someone familiar with your wireless network deployment
strategy and the features required of the Alcatel Wireless LAN solution. You
can manually determine the locations for APs, or use a Web browser to access
the Alcatel Wireless LAN Switch’s built-in RF Plan tool and perform the
following tasks:
zDefine the physical site parameters.
1
2
3