Installation
U098I
Figure 11
6.Remove the spacers carefully, allowing the machine to settle into the wet grout.
7.Position the mounting bolt washers and locknuts on the anchor bolts and fingertighten locknuts to machine base.
8.After the grout is completely dry, tighten the locknuts by even increments – one after the other – until all are tightened evenly and the machine is fastened securely to the floor.
9.Remove the four red transport brackets used to secure the machine during shipping. See Figure 12.
21
F232058