Base Frame
Locknut
2" | | 3 1/2 x 2 Inch |
(51 mm) | | Dia. Bolt |
| |
| | Grout |
6" | MIN | |
(152 mm) | Anchor |
| |
| | Bolt |
U095IEP
Figure 8
After the anchor bolts are installed and the concrete has cured, proceed as follows:
1.Place the washer-extractor adjacent to the foundation. Do not attempt to move it by pushing on the sides. Always insert a pry bar or other device under the bottom of the frame of the washer-extractor to move it.
2.Remove the wood skid by unscrewing the carriage bolts holding it to the bottom frame of the washer-extractor.
3.Place the washer-extractor carefully over the anchor bolts. Never attempt to lift the machine by the door handle or by pushing on the cover panels.
4.Raise and level the washer-extractor 1/2 inch off the floor on three points, using spacers such as nut fasteners.
20
5.Fill the spaces between the washer- extractor base and floor with a good quality non-shrinking machinery grout to ensure a stable installation. See Figure 9 for grouting the 35-pound capacity model. See Figure 10 for grouting the 50-pound capacity model. See Figure 11 for grouting the 85-pound capacity model.