Connect L1 and L2 to the power block and ground to the copper lug located in the rear service box mentioned on the previous page.

SINGLE-PHASE (1Ø) ELECTRICAL CONNECTIONS LEADS

Black

White

Green

+

-

 

Positive

Neutral

Ground

 

or

 

 

L2

 

If local codes permit, power to the dryer can be made by the use of a flexible U.L. listed power cord/ pigtail (wire size must conform to rating of dryer), or the dryer can be hard wired directly to the service breaker panel. In both cases, a strain relief must be installed where the wiring enters the dryer.

b.3-Phase (3ø) Wiring Connections (Hookup) - For Non-Reversing Models Only

The electrical connections on ALL 3-phase (3ø) gas model dryers are made into the rear service box located at the upper left area of the dryer.

NOTE: A CIRCUIT SERVICING EACH DRYER MUST BE PROVIDED.

If local codes permit, power to a gas dryer can be made by the use of a flexible U.L. listed power cord/ pigtail (wire size must conform to rating of dryer), or the dryer can be hard wired directly to the service breaker panel. In ALL cases, a strain relief must be installed where the wiring enters the dryer.