Stop/Start UPS and Operating the External Service Bypass

2.6.2Switching the Parallel System from External Bypass into Normal UPS Operation

Mains

Load

Service bypass switch

APC Silcon

UPS

APC Silcon

UPS

NOTICE!

If battery has been disconnected, please refer to section 2.4.1 UPS start-up.

 

990-4036

 

 

User Guide APC Silcon 120-160kW 400V UPS

15

Page 15
Image 15
American Power Conversion 120-160kW manual Stop/Start UPS and Operating the External Service Bypass