American Power Conversion 240-320kW400V manual System type XXX kVA Stop charge DC capacitors YES

Models: 240-320kW400V

1 32
Download 32 pages 9.79 Kb
Page 8
Image 8
System type XXX

Stop/Start UPS and Operating the External Service Bypass

1.Check that the system has been in a stable environment for at least 12 hours enabling any condensation to evaporate prior to start-up.

2.Open front door(s)

3.Switch on mains power by closing Q001 See notice below.

4.Wait for approx. 10 seconds

5.

Press

on the keyboard

6.

Press

on the keyboard

7.Wait for approx. 1 second

8.Wait for approx. 1 minute

9.Close MCCBs in Battery Breaker Box or Battery Cabinet

10.Press the green ON button

11.Close the front door(s)

Display shows

System type XXX

XXX kVA - XXX

Stop charge DC capacitors : YES

Start charge DC capacitors : YES

Data stored

Start charge DC capacitors : YES

Insert fuse or close MCCB

**System OFF**

Normal operation load power XX%

System start-up now completed.

NOTICE!

One of the following display messages will appear by UPS start-up:

“STD”: Standard (single system)

“PAR”: Parallel System

“ECO”: Economy mode (single or parallel systems) (Last message has priority over the other two)

kVA size (XXX) and the voltage reads:

• XXXkVA - 400 (380 or 415 Volt)

990-4057

8

User Guide APC Silcon 240-320kW 400V UPS

Page 8
Image 8
American Power Conversion 240-320kW400V System type XXX kVA Stop charge DC capacitors YES, Normal operation load power XX%