Site Preparation – Operating Environment
AIS® 3000 10-40kVA, 400V, Site Preparation and Installation Manual – 990-2258 25
EPO switch wiring
The UPS must be connected to either a dry contact or a 24VDC Emergency Power Off (EPO) sw itch.
See EPO wiring options in this manual.