AIS® 3000 10-40kVA, 400V, Site Preparation and Installation Manual – 990-2258 27
Site Preparation Checklist
System components. Have you –
Site Preparation. Have you –
Arrival Preparation. Have you –
determined minimum battery runtime requirement based on load (kW and kVA) and selected the
correct XR Enclosures (ISVTBXR2B6S, ISVTXR2B6S, ISVTBXR6B6S, ISVTXR6B6S) and
Battery Unit (SYBT1). Always install a whole Battery Module (4 Battery Units) at a time.
considered Service Program or Extended Warranty plan?
considered correct operating space, floor strength (see Installation Space Requirements), cooling,
and environment (see Operating Environment).
reviewed all electrical work to determine wiring requirements?
verified that space and handling equipment are available to receive the UPS/XR Enclosure?
(Including unloading the UPS/XR Enclosure from the delivery truck).
scheduled an authorized electrician to install the UPS/XR Enclosure?