1 |
|
|
|
|
|
| CAUTION |
| |
| Turn off hot and cold water supplies before beginning. | |||
|
|
|
|
|
ROUGHING-IN FITTING
Prepare water supplies per
Slip COUPLING NUT over supply pipe and screw UNION SWIVEL to pipe.
For Sweat Connection: Slip COUPLING NUT over 5/8" O.D. supply tube and solder tube into UNION SWIVEL or female inlet of valve.
Install VALVE at indicated height and depth. Notice that finished wall has to be between the MAX WALL and MIN. which is
Connect HOT water supply to left VALVE inlet and COLD water supply to right VALVE inlet. Tighten both COUPLING NUTS firmly.
Secure VALVE BODY to cross brace of wall structure.
SHOWER
ARM
NIPPLE
SHOWER
HEAD
"HOT"
"MAX | MAX |
WALL" | WA |
| L |
| L |
ELBOW
CROSS
BRACE
|
| M |
2 |
| I |
| N | |
| 1 | |
| - | |
| 5/ | |
| 8 | |
STEM | "DEEP | |
| ||
SOCKET |
| |
|
|
Prepare SHOWER RISER, ELBOW, and
connect to top outlet of VALVE BODY. Outlet is 1/2" female NPT.PLASTER GUARD
Prepare TUB FILLER PIPE, ELBOW and 1/2" NPT SPOUT NIPPLE. Final length of SPOUT NIPPLE to be
Add cross braces to wall structure and secure piping.
Cap
Remove PLASTER GUARDS by turning counter clockwise and pulling. (Do not discard).
SPOUT
PLASTER GUARD has a STEM SOCKET to operate valves.
Turn PLASTER GUARD over and push STEM SOCKET onto VALVE STEM.
Open hot and cold valves and check for leaks.
Close both valves, turn off water supplies, and replace PLASTER GUARDS.
Finish wall construction.
MAXW
A
L
L
M I N 1 - 5/
8"DEEP
M | AX |
WA | |
| L |
| L |
M |
|
I |
|
N |
|
1 | |
- | |
5/ | |
| 8" |
| DEEP |
TUB
FILLER
PIPE
ELBOW
NIPPLE
"COLD"
UNION SWIVEL
SUPPLY
PIPE
COUPLING
NUT
3 FINISHING INSTALLATION
Remove caps from
Remove PLASTER GUARD by turning
If VALVE BODY is roughed in deep (more than
If VALVE BODY is roughed in SHALLOW (less than
Assemble RUBBER RING to ESCUTCHEON.
Screw ESCUTCHEON and SLEEVE onto VALVE COVER against wall.
Install SHOWER ARM, SHOWER ARM FLANGE and TUB SPOUT.
DEEP
MORE THAN 1 - 1/2"
SLEEVE
VALVE
COVER
RUBBER
RING VALVE
BODY
SHALLOW
LESS THAN 1 - 1/2"
SLEEVE
ESCUTCHEON
4 TEST INSTALLED FAUCET
Turn HANDLES into "off" position.
Turn on water supplies and check all connections for leaks.
Operate both HANDLES to flush water lines thoroughly.
Check SHOWER HEAD and connections for leaks.
Turn handles into OFF position.
5 SERVICE
To change direction of handle rotation,
proceed as follows:STOP WASHER
Turn valve to OFF position.
Pull out INDEX CAP and remove
HANDLE SCREW.
Pull off HANDLE BASE and remove
ADAPTER.
Remove SPRING CLIP.
Lift STOP WASHER, turn 90$ and replace.
Replace SPRING CLIP.
Reinstall HANDLE. (See step 4).
90$
SPRING
CLIP
If spout drips, operate handles several times from OFF to ON position. Do not force - handles turn only 90$.
HOTLINE FOR HELP
For
1 (800)
Weekdays 8:00 a.m. to 7:00 p.m. Eastern Time
IN MEXICO
IN CANADA
P r o d u c t n a m e s l i s t e d h e r e i n a r e t r a d e m a r k s o f A m e r i c a n S t a n d a r d I n c .
© A m e r i c a n S t a n d a r d I n c . 2 0 0 0 | M968716 Rev. 1 . 1 |
|