American Standard T555730 Trim Installation, Handle Installation, Temperature Calibration

Models: T555730

1 3
Download 3 pages 20.88 Kb
Page 2
Image 2
1TRIM INSTALLATION

1TRIM INSTALLATION

Push CAP (1) over the O-RING SEAL (2).

2

 

Push ESCUTCHEON (3) over CAP (1).

 

Attach ESCUTCHEON (3) to VALVE (4) with the two SCREWS

 

(5)provided.

Align DIAL PLATE (6) and push DIAL PLATE (9) into place.

1

3

HANDLE INSTALLATION4

6

5

2

HANDLE INSTALLATION

 

 

 

2

1

 

 

Align HANDLE BASE (1) with KNOB MOUNT (2) and push

3

 

 

onto KNOB MOUNT (2).

 

 

Install HANDLE (3) as shown. Install HANDLE SCREW (4) and

4

5

 

tighten with screwdriver.

 

Push KNOB CAP (5) into HANDLE (3).

3TRANSPOSED SUPPLY PIPING OR BACK TO BACK INSTALLATION

Should the hot and cold water supply pipes have been transposed making

adjustment impossible, proceed as follows:

Shut off water supply.

CHECK STOP

Remove handle and rim

(BLUE TO RED)

 

3TRANSPOSED SUPPLY PIPING OR BACK TO BACK INSTALLATION Remove check stops and re-install them transposed.

Important note: RED CHECK STOP is now on the right of the mixer body and the BLUE

CHECK STOP is now on the left.

Turn the water supply back on and perform the temperature adjustment in step 4.

CHECK STOP

(RED TO BLUE)

 

4TEMPERATURE CALIBRATION

Check that arrow marking B points vertically upwards. If not, push the BLACK CLAMP (1) on the SECURING RING (2) to the right, pull off KNOB MOUNT (3) and reinstall KNOB MOUNT (3) with arrow "B" pointing upwards.

SET HOT LIMIT STOP

4

 

 

The maximum mixed water temperature is set at 109˚F at the factory.

 

 

 

 

 

 

This setting can be changed if desired.

 

 

adjustment impossible, proceed as follows: Remove the TEMPERATURE LIMIT STOP (4) (H shaped Black Plastic part). Reinstall it at the desired notch as indicated in the diagram to limit the maximum

mixed water temperature to 104˚F or 112˚F.

For 100˚F adjustment, turn the water supply on. Turn KNOB MOUNT (3) until the spout temperature is 100˚F. Check that arrow marking A on the KNOB MOUNT (3) still points upward after adjusting the thermostat to 100˚F. If not, pull out the RED LOCKING DEVICE (5). Remove KNOB MOUNT (3) without turning by sliding out as indicated by the arrow.

Reinstall the KNOB MOUNT (3) so that the arrow marking A points upwards. Reinstall RED LOCKING DEVICE (5).

ARROW

"B"

104

109

112

2

5 4TEMPERATURE CALIBRATIONSET HOT LIMIT STOP

1

ARROW

"A"

3

5OPERATING THE VALVE

Turn on water supply on and test installed fitting.

If the system is delivering all Hot or all Cold and no mixed water the pipes are probably transposed. See step 3 for TRANSPOSED SUPPLY PIPING.

Operate valve from off to cold to hot. Check temperature. If max mixed water temperature is to hot or to cold see step 4 and re-calibrate the valve.

HOT

COLD

OFF M 9 6 8 6 5 8

Page 2
Image 2
American Standard T555730 Trim Installation, Handle Installation, Transposed Supply Piping Or Back To Back Installation