Installation Guide
Overview
The
Wall Mount panels (NXDs) are contained within a metallic outer housing (back box). This back box is not removed when installing the NXD into a
1.Rest the right Stud Mounting tabs onto the stud (keeping the knockouts on the left). Be sure to leave enough of a gap between the stud and NXD Mounting tabs to accommodate the installation of the drywall or sheetrock after the
2.Fasten the
Specifications
CB-TP7 (FG035-10) Specifications
Dimensions (HWD) | • 5 | 1/2" x 7 1/4" x 3 3/8" | |
| • 13.9 cm x 18.4 cm x 8.6 cm | ||
|
|
| |
Included | • 4 | Phillips | |
Accessories | • | 4 | Phillips |
|
|
| |
Certifications | • | cTUVus Listed | |
|
|
|
|
WARNING: INSTALLER, LEAVE A GAP BETWEEN THE STUD AND
This gap allows the installation of the drywall/sheetrock after the
Note: The most important thing to remember when mounting this
It is recommended that you cut out the surface slightly smaller than what is outlined in the installation drawings so that you can make any necessary cutout adjustments.
The wiring knockouts on the left side will be used for the
Pre-Wall Installation of the CP-TP7 Rough-In Box
• Refer to the SP225802 diagram for detailed installation dimensions (see |
reverse). |
See reverse for detailed dimensions
Do Not Use these tabs to mount the
Drywall
FIG. 1 CB-TP7 - Drywall Installation
Stud
Front surface of mounting tabs should be flush with outside face of drywall
• Cutting out the surface slightly smaller than what is outlined in the installation |
drawings, in order to make any necessary cutout adjustments, is highly |
recommended. |
• The wiring knockouts on the left side will be used for the |
panel connectors, so always secure the |
Mounting Holes on the right side of the box. |
3.Remove the wiring knockouts from the left side of the
Note: Remember that when mounting this
4.Thread the incoming power,
5.Install the drywall/sheetrock before inserting the main NXD unit into the