3. Install an appropriate fitting with a lock-nut for each knockout used.

4. Connect conduits to the fittings.

Note: If not using conduits, run the cables through the knockout directly.

Mount the EPO (running conduits or cables behind the wall)

1.Install a junction box or a switch box behind the wall. The EPO box will fasten directly to the box. Use one of the options above.

990–1611C-001

Emergency Power Off System Installation and Operation

7