Smart-UPS X 2000/2200/3000 VA XL Tower/Rack-Mount 4U2
Inventory

Inspect the conten ts upon receipt. N otify the carrier and dealer if the unit is damaged .

Included with all mode ls
1 pair rail cleats
8 pan head screws 1 pair tower stabilizer brackets
Use 8 flat head sc rews to secure tower stabilize r brackets to the UPS
1 pair rack-mount brackets
Use 8 flat head screws to secure rack-mount brackets to the UPS
Use 4 ornamental screws to secure rack-mount brackets to the rails
Install a cage nut in the rack to secure the top hole of each rack-mount
bracket in a four post rack
(1) Documentation CD
(1) PowerChute software CD
Rack-mount support brackets and hardware Included with models that have factor y installed
Network Management Cards
1 pair support
brackets Two p o st rac ks
10 screws Four post racks
6 screws
6 washers
Included with High Voltage (HV) models