Apple 073-0711 warranty Tools Required, Opening the Server, Logic Board with Processor/Heatsink

Models: 073-0711

1 13
Download 13 pages 54.09 Kb
Page 1
Image 1
ð Xserve

ð Xserve

Logic Board with Processor/Heatsink

Replacement Instructions

Follow the instructions in this sheet carefully. Failure to follow these instructions could damage your equipment and void its warranty.

Note: Online instructions covering customer-installable parts are available at http://www.info.apple.com/installparts/.

Tools Required

The only tool required for this procedure is a Phillips screwdriver.

Opening the Server

The server slides open from the front of the rack. The top cover remains in place in the rack while the bottom housing (containing all internal components) should be placed on a sturdy, flat surface.

1.Alert users that the server will be unavailable for a period of time.

2.Shut down the server.

Warning: To avoid damaging internal components or causing injury, always shut down the server before opening it. After you shut down the server, internal components can be very hot. Let the server cool down before continuing.

073-0711 Rev. B

Page 1
Image 1
Apple 073-0711 warranty Tools Required, Opening the Server, Logic Board with Processor/Heatsink, Replacement Instructions