Step Three: Install

Discharge Chute Crank

1.Remove the gear cover from top of chute pedestal.

2.Insert the short end of the chute crank into the hole in the front of the control panel.

NOTE: Be careful not to damage nylon bushing when attaching crank to the dash.

3.Connect the chute crank to the pinion gear on chute with hairpin.

4.Replace gear cover on top of chute pedestal.

5.Orient the chute and pedestal to its most vertical position and tighten pedestal hardware to 15 – 31 lbf-ft (20 – 42 N•m).

Page 10
Image 10
Ariens 921030 quick start Step Three Install Discharge Chute Crank