For watercooling system with 1/2” or 10mm ID tubes

1.Insert a fitting (1/2” to 3/8” ID or 10mm to 3/8” ID) into the tube.

Your watercooling system may come with tube clips. Use the clips to fasten the fittings and the tubes together.

2.Connect a supplied 3/8” ID tube to the fitting.

3.Firmly press a tube clip and hitch it to the bottom end of the 3/8” ID tube.

4.Press another clip and hitch it to the top end of the 3/8” ID tube.

1

2

3

4

 

 

 

 

5.Press the clip and connect the assembled tube to the waterblock. When done, release the clip to tighten the two together.

6.Repeat Step 1 to 5 for another tube. Make sure that both tubes are well connected to prevent leak, and then fill the coolant into the reservoir. The picture shows a watercooling system installed to the motherboard.

5

 

6

 

 

 

2-40

Chapter 2: Hardware information