4
Tools needed:
M8x15
QNR
I
N x4
Q x18
4.Attach holder (I) to panel (A) with screws (N), and insert Pads (Q) into the frames(E&F).
- 7 -
4
Tools needed:
M8x15
QNR
I
N x4
Q x18
4.Attach holder (I) to panel (A) with screws (N), and insert Pads (Q) into the frames(E&F).
- 7 -