Atlantis Land A03-S801 Introducing the Front Panel, Line Connection, Operation Test, Main Switch

Models: A03-S801

1 17
Download 17 pages 19.99 Kb
Page 11
Image 11

b.The Standard Package Includes:

1.User’s Manual

2.AC Input Power Cord ( Not available for hand wiring condition models)

3.IEC output cables ( for the UPS with IEC sockets only)

4.RJ11 Phone Jack Cable

5.UPS communication kit (optional)

2.Line Connection

First, connect the UPS with the AC Mains.

Then, connect the line of your computer to the output sockets of the UPS.

3.Operation Test

a.Connect the UPS to the wall receptacle.

Please follow the general testing procedures to check if your UPS meets working requirements:

(1)Push on the Main Switch to check the Green Line () LED is on.

(2)Connect your computer equipment with sockets of the UPS and pull off the Power

Cable of the UPS from the wall receptacle to check if the Inverter LED is flashing

every 3 seconds. Meanwhile, please check if

Alarm buzzer is beeping.

(3)Try the field working condition by running some application programs on your computer and repeating step.

(4)Check if the UPS is initiated properly to support a continuous operation.

Important Notice: Please plug the UPS into the wall outlet to charge the UPS for over 8 hours before using the UPS.

INTRODUCING THE FRONT PANEL

Front Panel Explanation

1.Line LED (): Green Line LED remains at a standstill when Utility Normal.

2.Inverter LED (): Amber LED is on when the UPS is on Battery Backup mode.

1.Overload LED (): Red Overload LED is on when the UPS is on overload condition.

2.Fault LED (): Red Fault LED is on when the UPS is Abnormal.

3.Main Switch:

a.To Control on/off the UPS when Utility is normal.

b.To enable “DC-Start” Function when Utility fails. (To enable DC Start properly, you are recommended to connect <80% output load with the UPS only)

4 3 2 1 5

P.S.: Make sure the computer connected to the UPS is switched on before enable the "DC-Start" function .You are not recommended to add some other computer or peripherals after DC-Start function is activated.

Page 11
Image 11
Atlantis Land A03-S801 manual Introducing the Front Panel, Line Connection, Operation Test, Main Switch