Bacharach 24-9415, 24-7224 manual Operation

Models: 24-7224 24-9415

1 10
Download 10 pages 48.81 Kb
Page 4
Image 4
Operation

Flue Gas Sample Conditioning System

Operation

When ready to conduct a combustion efficiency test, plug in the power supply of the Flue-Gas Sample Conditioning System. You should hear the condensate pump start running and see the Peltier cooler’s red LED turn on and off as the cooler is cycled. Note that the cooler’s operating time changes according to its temperature.

Set up and configure the combustion analyzer as described in its in- struction manual. Then insert the probe into the flue stack and begin testing.

During the combustion test, the condensed water vapor from the flue gas will accumulate inside the pump’s reservoir. If the water level be- gins to approach the ends of the tubes inside the reservoir, then stop the test and empty the reservoir as described in the Maintenance Section of this manual.

WARNING! The probe tube is hot! In the following step, be sure to allow the probe tube sufficient time to cool before handling.

At the conclusion of the combustion test, remove the probe from the stack; then unplug the Peltier cooler’s power supply.

Bacharach, Inc.

Instruction 24-9415

Page 4
Image 4
Bacharach 24-9415, 24-7224 manual Operation