Bard GVDM-26 AIR Purge Port, SOLDERING, then RE-INSTALL Wrap with Provided Insulation

Models: GVDM-26

1 11
Download 11 pages 25.27 Kb
Page 7
Image 7

Figure 2

AIR PURGE PORT

AIR PURGE PORT

NOTE: PUMP IS NOT SELF-PRIMING, IT I S

RECOMMENDED TO MANUALLY BLEED-OFF

AIR.

INLET FROM WATER

HEATER

FROM DSH COIL

OUTLET

INLET THERMISTOR

NOTE: REMOVE DURING TUBE

SOLDERING, THEN RE-INSTALLOUT TO WATER HEATER

AND WRAP WITH PROVIDED INSULATION.

OUT TO DSH COIL INLET

OUTLET THERMISTOR

NOTE: REMOVE DURING TUBE

SOLDERING, THEN RE-INSTALL

AND WRAP WITH PROVIDED

INSULATION.

NOTE: INSTALLER MUST INSURE THAT THE INLET THERMISTOR

IS RE-LOCATED BACK TO THE INLET TUBE AND THE OUTLET

THERMISTOR IS LOCATED BACK ON THE OUTLET TUBE.

VERIFY BY CONNECTIONS ON CONTROL BOARD

MIS-2651

Manual

2100-517

Page

7 of 11

Page 7
Image 7
Bard GVDM-26 installation instructions AIR Purge Port, SOLDERING, then RE-INSTALL Wrap with Provided Insulation