Cold Front Planning Guide
Part 1: General
1.1 Summary
The Black Box® Cold Front™
connections. A Transition Frame might be required to attach the HTD to the IT enclosure.
1.2 Design Requirements
The HTD is described under the following Black Box part numbers.
Table
Product Code | Product Name | Description |
|
|
|
CFD42UBF24 | Cold Front | 24"W, bottom feed |
|
|
|
CFD47UBF24 | Cold Front | 24"W, bottom feed |
|
|
|
CFD42UTF24 | Cold Front | 24"W, top feed |
|
|
|
CFD47UTF24 | Cold Front | 24"W, top feed |
|
|
|
CFD42UBF29 | Cold Front | 29" W, bottom feed |
|
|
|
CFD47UBF29 | Cold Front | 29" W, bottom feed |
|
|
|
CFD42UTF29 | Cold Front | 29" W, top feed |
|
|
|
CFD47UTF29 | Cold Front | 29" W, top feed |
|
|
|
1.3 Quality Assurance
The HTD is factory tested before it’s shipped to you.
1.4 Warranty
The HTD is warranted for a period of 3 years (36 months).
Part 2: Product
2.1Standard Components 2.1.1 HTD Construction
1.The HTD is no deeper than 4.6" (11.7 cm), and its width is no greater than the IT enclosure the HTD is mounted to.
2.The HTD’s dry weight is no more than 90 lb. (41 kg).
3.All exterior surfaces are
4.The HTD mounts on hinges to allow access to rear of IT equipment within the enclosure.
5.The HTD is equipped with a keyed lock to secure access to the equipment mounted in the enclosure.
2.1.2 Transition Frame Assembly
1.A transition frame assembly is factory supplied for adapting to
2.The transition frame connects the HTD to the rear frame of the IT enclosure.
3.The transition frame is
4.The transition frame is no deeper than 2.4" (6.1 cm), and its width will be no greater than the IT enclosure the transition frame is mounted to.
Page 2 |