Black Box RMT3200A-R2 Assembly Instructions, Universal Flat Pack Cabinet Manual, Page, 16 M6 nuts

Models: Universal Flat Pack Cabinet RMT3200A-R2

1 8
Download 8 pages 37.23 Kb
Page 4
Image 4
3. Assembly Instructions

Universal Flat Pack Cabinet Manual

3. Assembly Instructions

STEP 1: Connect two frames to the top and bottom panels, then use M6 nuts to secure them in place.

(16) M6 nuts

STEP 2: As shown in the diagram below, align the tabs of the horizontal supports to the slots in the vertical frame members and drop into place. Install the (2) bottom horizontal supports first. They are larger than the top/middle horizontal supports and must be installed in the bottom positions to allow the vertical rails to be installed. Use the blue and yellow plastic clips to attach the horizontal rails to the vertical frame.

Front of Cabinet

Blue rail

(12) blue clips

Yellow rail

(8) yellow clips

 

Yellow rail

Blue rail

NOTE: Use the blue clips on the “blue rails” and the yellow clips on the “yellow rails.” When you look directly at the front and rear of the cabinet (as shown in the diagram above), the left rail would use blue clips and the right rail would use yellow clips.

Page 4

724-746-5500 blackbox.com

Page 4
Image 4
Black Box RMT3200A-R2 manual Assembly Instructions, Universal Flat Pack Cabinet Manual, Page, 16 M6 nuts, Yellow rail