Briggs & Stratton 1695284 manual Bag Installation and Tube Assembly

Models: 1695284

1 14
Download 14 pages 17.8 Kb
Page 9
Image 9
Bag Installation and Tube Assembly

A

 

C

B

 

D

 

Figure 7. Install Collector Bags

A.Cover

B.Collector Bags

C.Grass Bag Hanger

D.Bag Hanger Post

INSTALL COLLECTOR BAGS

1.Raise the cover (A, Figure 7).

2.Attach collector bags (B) using grass bag hanger (C) to bag hanger post (D).

Bag Installation and Tube Assembly

50” Mowers

A

50” Mowers

C

B

Figure 8. Middle and Upper Tube Assembly

A.Upper Tube

B.Middle Tube

C.Screw, 1/4 x 3/4

CONNECTING UPPER AND MIDDLE TUBE

1.Slide the upper tube (A, Figure 8) over middle tube

(B) and secure together using screw (C).

In upper tube:

-Fourth hole from end is for 50” mowers See Figure 8 for hole locations.

7

Page 9
Image 9
Briggs & Stratton 1695284 manual Bag Installation and Tube Assembly