![](/images/new-backgrounds/1114189/11418923x1.webp)
Normal Installation
& Removal
A. Hitch Support Assembly |
|
|
|
| J | |
B. Bag and Cover Support Assembly |
|
| I | K | ||
C. Shoulder Bolt |
|
|
|
| ||
|
|
|
|
| ||
D. Mount Pin |
|
| L |
|
| |
E. Retainer Spring |
|
|
|
| ||
F. Hinge Pin |
|
|
|
|
| |
G. Retainer Spring |
|
|
|
|
| |
H. Cover Hinge Pivots |
| M |
|
|
| |
I. | Cover |
|
|
|
| |
|
|
|
|
| ||
J. Bag |
| N |
|
|
| |
K. Bag Hanger |
| G |
|
| ||
L. Ridge Cutout |
|
|
| H | ||
M. Upper Tube |
|
|
|
|
| |
N. Ridge |
|
|
|
| B | |
O. Tube Assembly |
|
| F |
|
| |
P. Rubber Strap |
|
|
|
| ||
| P |
|
|
| ||
Q. Pin |
| E | G | F | ||
R. Chute |
| O | ||||
S. Knob | Q |
|
|
| X | |
T. Carriage Bolt |
|
|
|
| ||
|
|
|
| D | ||
U. Wing Nut |
|
|
| C | ||
|
|
|
| |||
V. Discharge Deflector | R | V |
|
| C | |
W. Carriage Bolt | U |
|
|
| ||
X. Support Mount |
|
|
|
|
| |
|
| S |
|
|
| A |
|
|
|
|
|
| |
|
|
| W |
|
|
|
|
| T |
|
|
|
|
Figure 9. Normal Installation & Removal
NORMAL INSTALLATION & REMOVAL
Installation
NOTE: See previous pages for more detailed installation and operation instructions if necessary.
1.Attach bag and cover support assembly (B, Figure 9) to hitch support assembly (A) by sliding the support mount (X) into place until full contact is made with the shoulder bolts (C).
2.Insert mount pin (D) through support mount (X) and upright of hitch assembly (A).
3.Secure mount pin (D) with retainer spring (E).
4.Attach cover assembly (I) to bag support assembly
(B) using cover hinges pivots (H). Secure cover assembly (I) to bag support bracket (B) using hinge pins (F) and retainer springs (G).
5.Raise the cover (I), and attach collector bags (J) using grass bag hanger (K) to hanger post
(D, Figure 5).
6.Lift discharge deflector (V) up, and Place the holes of the chute (R) onto carriage bolts (T and W) sliding the front edge of the chute under the hinge bracket.
7.Secure knob (S) onto carriage bolt (T) as shown.
8.Secure wing nut (U) onto carriage bolt (W) as shown.
9.Slide upper tube (M) into cover (I) aligning ridge (N) with ridge cutout (L).
10.Slide tube assembly (O) over chute (R)
securing tube assembly (O) to lower chute (R) using rubber strap (P) on tube assembly (O) to pin (Q) on chute (R).
10