TYPICAL IN-LINE BLOWER INSTALLATION

INSTALLATION

1.Run 10" round ductwork, from exte- rior or in-line blower to the installation location. For best performance, use the straightest possible duct run and the fewest number of elbows. Tape all joints.

These ducting accessories are avail- able from you dealer:

Model 410 - 10" round duct in 24" sections

Model 421 - 10" round in-line damper

2.Run 120 VAC electrical power cables from service panel and exterior or in- line blower to installation location.

3.Mount hood to wall following direc- tions packed with hood.

WIRING DIAGRAM

4.Remove wiring box cover. Remove knockouts from the wiring box. Feed 6" of power cable through openings and attach cables to wiring box with appropriate connectors.

5.Align 10" round duct with collar on mounting plate. Attach plate to studs at top of hood with 4 nuts provided.

6.Connect wiring following the diagram below. Connect green wires together, then beneath the green ground screw. Connect white wires together. To func- tion properly, connect black wires only as shown.

TYPICAL INSTALLATION

10" Round

Duct

Studs

Power

Cables

Wiring

Box

Cover

Nuts

Refer to your hood instructions for warranty and service information.

Page 2
Image 2
Broan 356NDK warranty Wiring Diagram, Typical Installation