Page 25
BUNN
MANUFACTURED BY BUNN-O-MATIC CORPORATION
SPRINGFIELD, ILLINOIS, U.S.A.
MODELS/N
VOLTS A.C. AMP WATTS
PHASE WIRE HERTZ
COVERED UNDER ONE OR MOREOF THE FOLLOWING PATENTS :
ONE OR MORE OTHER PATENTS MAY BE PENDING
DISCONNECT FROM POWER SOURCE
BEFORE REMOVAL OF ANY PANEL OR
REPLACEMENT OF ANY COMPONENT!
WARNING
!
CAUTION :
WARMERS AND SURFACES ARE HOT
SERVICE (cont.)
BREW SWITCH (Start) - Model CEZ-APS/TS/TSR
Location:
The BREW switch is located in the center front of
the hood.
Test Procedure:
1. Disconnect the brewer from the power source.
2. Disconnect the white/yellow wire from the top
switch terminal and the white/orange from the
bottom switch terminal.
3. Check for continuity across the two terminals on
the switch when it is held in the lower position.
Continuity must not be present across these ter-
minals when the switch is released.