ASSEMBLY STEP 1

Attach the Rail to the Motor Unit

To avoid installation difficulties, do not run the garage door opener until instructed to do so.

ïRemove the two washered bolts mounted in top of motor unit.

ïPosition rail at a 45˚ angle to opener so one hole in rail and motor unit line up.

ïThread one of the washered bolts part way in.

Use only these bolts! Use of any other bolts will cause serious damage to door opener.

ïAlign rail and styrofoam over sprocket. Cut tape from rail, chain and styrofoam.

ïREMOVE STYROFOAM.

CAUTION

To avoid SERIOUS damage to garage door opener, use ONLY those bolts/fasteners mounted in the top of the opener.

USE ONLY THIS

TYPE AND SIZE

BOLTWashered Bolt 5/16"-18x1/2"

Styrofoam

Rail

Hole

ASSEMBLY STEP 2

Attach the Chain to the Sprocket and Install the Sprocket Cover

ï

Position chain over the sprocket. If necessary,

 

loosen the outer nut on the trolley to obtain more

 

chain slack.

ï

Insert the second washered bolt. CAUTION: Use

 

only the bolt previously removed from motor

 

unit!

WARNING

To avoid possible SERIOUS INJURY to fingers from moving garage door opener:

ALWAYS keep hand clear of sprocket while operating opener.

Securely attach sprocket cover BEFORE operating.

Washered Bolts

ï

Tighten both bolts securely through the rail into the

 

motor unit as shown.

ï

Install the sprocket cover: Insert the back tab in the

 

slot. Squeeze the cover slightly and insert the front

 

tab in the slot on the mounting plate.

5/16"-18x1/2"

USE ONLY THIS

TYPE AND SIZE

BOLT

Sprocket

Sprocket Cover

Back Tab Slot

Front Tab Slot

Mounting

 

 

Plate

6