![](/images/backgrounds/52271/52271-3610x1.png)
Header Wall
Header Bracket
INSTALLATION STEP 3
Attach the Rail to the Header Bracket
•Position the opener on the garage floor below the header bracket. Use packing material as a protective base. NOTE: If the door spring is in the way you’ll need help. Have someone hold the opener securely on a temporary support to allow the rail to clear the spring.
• Position the rail bracket against the header bracket.
• Align the bracket holes and join with a clevis pin
Chain Pulleyas shown.
Bracket
• Insert a ring fastener to secure.
Ring Fastener
Rail
Header Bracket
Clevis Pin
Chain
Pulley
Bracket
Rail
Garage
Door
Temporary
Support
HARDWARE SHOWN ACTUAL SIZE
Clevis Pin |
|
Ring Fastener |
10