
4 Mark Bracket Holes
MOUNT THE HEADER BRACKET
5 Drill Holes | 6 Attach Bracket |
Center bracket on the ìcenter of garage doorî line and the horizontal line made in Step 2.
Horizontal Line
UP
Highest Point
of Travel
Center of
Garage Door
Drill two 3/16" | Secure bracket |
pilot holes | |
A14 Bracket | with lag screws |
Mark the top |
|
and bottom | UP |
bracket holes | C18 Lag Screw |
Ceiling Mount the Header Bracket (Optional)
NOTE: If your installation requires that the header bracket be mounted to the ceiling. The back edge of the bracket MUST NOT be further than 6" (15 cm) from the header wall and the arrow MUST point away from the header wall.
7 Attach Rail to the Header Bracket
A14 Header Bracket | C6 |
| Ring Fastener |
| A14 |
| Header |
| Bracket |
| C11 |
| Clevis Pin |
| Mounting |
| Hole |
| Existing |
| Header Bracket |
| Existing |
| Clevis Pin |
| C2 |
| Spacer |
Garage | Mounting |
Hole | |
Door |
|
| Opener Carton |
Center the bracket on the ìcenter of garage doorî line
A14
Bracket
Use holes on left and right side to secure bracket
Ceiling Mount
A14
Header
Bracket C6
Ring Fastener
C11
Clevis Pin
Mounting
Hole
NOTE: If the door spring is in the way, youíll need help. Have someone hold
Option with
some
installations temporary support to allow the rail to clear the spring.
ALL HARDWARE
SHOWN
ACTUAL SIZE
C18 Lag Screw | C11 Clevis Pin | C6 Ring Fastener | C2 Spacer |
11