4 Mark Bracket Holes

MOUNT THE HEADER BRACKET

5 Drill Holes

6 Attach Bracket

Center bracket on the ìcenter of garage doorî line and the horizontal line made in Step 2.

Horizontal Line

UP

Highest Point

of Travel

Center of

Garage Door

Drill two 3/16"

Secure bracket

pilot holes

A14 Bracket

with lag screws

Mark the top

 

and bottom

UP

bracket holes

C18 Lag Screw

Ceiling Mount the Header Bracket (Optional)

NOTE: If your installation requires that the header bracket be mounted to the ceiling. The back edge of the bracket MUST NOT be further than 6" (15 cm) from the header wall and the arrow MUST point away from the header wall.

7 Attach Rail to the Header Bracket

A14 Header Bracket

C6

 

Ring Fastener

 

A14

 

Header

 

Bracket

 

C11

 

Clevis Pin

 

Mounting

 

Hole

 

Existing

 

Header Bracket

 

Existing

 

Clevis Pin

 

C2

 

Spacer

Garage

Mounting

Hole

Door

 

 

Opener Carton

Center the bracket on the ìcenter of garage doorî line

A14

Bracket

Use holes on left and right side to secure bracket

Ceiling Mount

A14

Header

Bracket C6

Ring Fastener

C11

Clevis Pin

Mounting

Hole

NOTE: If the door spring is in the way, youíll need help. Have someone hold

Option with

some pre-existingthe opener securely on a

installations temporary support to allow the rail to clear the spring.

ALL HARDWARE

SHOWN

ACTUAL SIZE

C18 Lag Screw

C11 Clevis Pin

C6 Ring Fastener

C2 Spacer

11