Installation Instructions MCB1U / LCB1U
5
TOOLS REQUIRED FOR INSTALLATIONPARTS
#2
1/2" or 13mm
3/32" (included)
1/8" (included)
5/32" (included)
M5 (included)
C (6)
E (6)
[Interface Bracket Hardware Kit]
A (8)
M4x16mm B (6)
M4x20mm M4x25mm D (6)
M5x16mm
M5x20mm F (6)
M5x25mm G (6)
M6x16mm H (6)
M6x25mm
I (6)
M8x20mm J (6)
M8x30mm
K (4)
M8x50mm
L (8)
.750x.323x.250
M (8)
.750x.344x.500
N (8)
P (1)
[Universal
washer]
Q (1)
3/32" S (1)
5/32"
R (1)
1/8"
T (1)
10-24 x 1/4" U (2)
5/16" x 1" V (2)
W (8)
10-24" x 1/2"
X (3)
5/16" x 3/4"
Z (4)
10-24 x 1/2"
BB (1)
[In bag
M5
CC (1)
[Bottom coupling]
5/16"
[Bottom stop collar]
(Used with CPA Series
extension column syst e m) (Used with 1-1/2"
NPT column system)
DD (1)
[Ceiling mount
assembly - MCB1U]
DD (1)
[Ceiling mount
assembly - LCB1U]

OR

EE (4)
[Side cover]
FF (4)
[Interface bracket]
labeled "N"]
GG (8)
[Interface
bracket cover]
AA (4)
10-24
Y (4)
10-24 x 5/8"
(2 bags total - quantities listed per bag)