OPERATION
AUTOMATIC BLOWDOWN INSTRUCTIONS |
| OPERATION— Set the “BOILER PROGRAMMED DUTY” | ||
(IF FURNISHED) |
| switch to “BOILER ON” if the boiler is to be shut down each night. | ||
The Automatic Blowdown is a device which automatically starts |
| Set it to | ||
up your boiler in the morning; shuts it down at night and blows down |
| ly | ||
(partially drains) the main boiler drain and the low water |
| Set the tabs on the large timer for the ON and OFF times desired | ||
umn for a predetermined time interval each working day. |
| for the boiler, screw in the small black | ||
The heart of the unit is an electrically operated straight through |
| during the weekend, etc. | ||
type ball valve. It is specially designed to handle dirty, corrosive flu- |
| If the boiler is on | ||
ids and particles without requiring cleaning or the use of a strainer. |
| desired for blowdown. Tzhe ON tab can be ignored, but must remain | ||
Both the valve and the boiler are controlled by an electric control |
| on timer. | ||
unit which indicates with pilot lights when the drain valve is in the |
| The small time delay relay controls the time that the drain valve | ||
opened or closed position and when the boiler is ON or OFF. In addi- |
| remains open. The time is controlled by adjusting knob marked | ||
tion to the automatic control function, the unit has a push button which |
| Blowdown cycle. Counterclockwise decreases, clockwise increases | ||
momentarily |
| blowdown time. Time must be adjusted by trial. | ||
less of the time of day. |
|
| ||
|
| |||
|
|
|
|
|
|
|
|
|
|
| Timer |
|
|
Boiler On
Valve Open
Valve Closed
Programmed Duty
24 Hour Duty
Manual Drain
Automatic Blowdown Control Cabinet
The unit may also be used to blow down boilers which run con- tinuously, day and night.
INITIAL TESTING — Set the switch marked “Programmed |
|
|
|
|
| Valve Actuator |
| ||||||||||||
duty/24 Hour duty” located on the panel box to the “ON” position. |
|
|
|
|
|
|
|
|
| ||||||||||
On the large timer set the “ON” tab at about 8 AM and the “OFF” |
|
|
|
|
|
|
|
| |||||||||||
tab at about 8 PM. Set the blowdown cycle dial at “O”. |
|
|
|
|
|
|
|
|
|
|
| ||||||||
Turn the large timer by hand until the “ON” tab passes the “TIME |
|
|
|
|
|
|
|
| |||||||||||
NOW” indicator so the “TIME NOW” arrow indicates 10 AM. |
|
|
|
|
|
|
|
|
| ||||||||||
Energize the main feed to the “LINE TERMINALS” of the unit. |
|
|
|
|
|
|
|
| |||||||||||
The “BOILER ON” pilot light as well as the “VALVE CLOSED” |
|
|
|
|
|
|
|
| |||||||||||
light should glow. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Hold down the “DRAIN” button for about six seconds. The |
|
|
|
|
|
|
|
| |||||||||||
“BOILER ON” light should go out immediately as well as the |
|
|
|
|
|
|
|
| |||||||||||
“VALVE CLOSED” light. It takes about 4 seconds for the drain valve |
|
|
|
|
|
|
|
| |||||||||||
to open fully at which time the “DRAIN VALVE OPEN” light should |
|
|
|
|
|
|
|
| |||||||||||
light. As soon as the “DRAIN” button is released the valve begins to |
|
|
|
|
|
|
|
| |||||||||||
close. When it reaches the closed position, the “VALVE CLOSED” |
|
|
| Display View of Automatic Blowdown Control Cabinet | |||||||||||||||
and the “BOILER ON” should light up again. |
|
|
|
|
|
|
| ||||||||||||
Now turn the wheel on the large timer until the “OFF” tab passes |
|
|
| Blowdown Cycle |
|
|
| ||||||||||||
the “TIME NOW” arrow. The “BOILER ON” light should go out and |
|
|
| Cycle | 30's |
|
|
| |||||||||||
|
|
|
|
|
|
| |||||||||||||
|
| Adjustment |
|
|
|
| |||||||||||||
the valve should begin to open. Once the “VALVE OPEN” light goes |
|
|
| 0's | 80's |
|
|
| |||||||||||
on, the valve should remain open for a few seconds and then auto- |
|
|
| Boiler On |
|
|
| ||||||||||||
|
| On/Off Switch |
|
|
|
| |||||||||||||
matically close. The “VALVE CLOSED” light should light and the |
|
|
|
| Support |
| |||||||||||||
|
|
|
|
|
|
| |||||||||||||
“BOILER ON” light should remain off. |
|
|
|
|
|
|
|
| Valve Closed |
|
| ||||||||
|
|
|
|
|
|
|
|
|
|
| |||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
| Indicator Light |
| Terminal Block |
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
| 2 |
| Valve Open |
| 7 Day Clock |
| |
3 |
|
|
|
|
|
|
|
|
|
|
|
| Indicator Light |
|
|
|
| ||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| ||
1FU |
|
|
|
|
|
|
|
|
| Clock |
| w |
|
|
| Support |
| ||
15A |
|
|
|
|
|
|
|
|
|
|
| Prorammed Duty |
|
| |||||
B |
|
|
|
|
|
|
|
|
| 3 | 1 | A |
| Switch |
| Control |
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| ||||
|
|
|
|
|
|
|
|
|
|
|
|
|
| (2.3) |
|
|
| ||
|
|
|
|
|
|
|
|
|
| 1 |
| 8 |
|
|
| Relay |
|
| |
1 1CL | 2 |
|
|
|
| G |
|
|
| 1TR |
| Ball Valve | 24 Hour Duty |
|
| ||||
|
|
|
|
|
|
|
|
|
|
|
|
| |||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
| Control | PB Switch |
|
| Time Delay Relay | |
1CL | 4 | P | 3 | 1PB | PR | 1CR |
| B |
|
| 1LT |
|
| (5) |
|
| |||
| 6 |
|
| R |
|
| Boiler On |
|
|
|
|
| |||||||
|
|
|
|
|
|
|
|
| Manual Drain |
|
|
| |||||||
|
| 2 |
|
| 1 |
|
| Y |
|
|
|
|
| Boiler Control | Fuse |
| 3 2 | 6 2 10 2 7 11 | 8 |
|
|
|
|
|
|
|
|
| 1CR |
|
|
| |||||||
|
|
|
|
|
|
|
| Motorized |
|
|
|
|
| (3) | Replace with |
| Terminal Block |
| |
2PB |
|
|
| 1TR |
|
|
|
|
| 2LT |
|
|
| Amp Fuse Only |
|
|
| ||
2B |
|
| 4 |
|
|
|
|
|
|
|
|
|
|
| Component Layout |
| |||
2A |
|
|
| 7 | R |
| O/R | 8 | R |
|
| Valve Closed | Exterior Side |
|
| ||||
|
|
|
|
|
|
|
|
|
|
| |||||||||
|
| 2 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 3 |
|
| M | W | 2 |
|
|
| Blowdown Valve |
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |||||
|
| BL |
|
|
|
|
|
|
| 11 0 | 3LT |
|
| Valve Open |
|
|
|
|
|
1A | 1B |
|
|
| 10 | B |
| O/BL | R |
|
|
|
|
|
|
| |||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| ||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| Wiring Diagram for Automatic Blowdown | |||
|
|
|
|
|
|
|
|
|
|
|
|
| 13 |
|
|
|
|
|
|