Cisco Systems 1200 manual Installation of the WLANE-C, T Bars, Level Surface

Models: 1200

1 7
Download 7 pages 38.21 Kb
Page 4
Image 4
Installation of the WLANE-C

Installation of the WLANE-C

Step 1: Unpack the box, check for all components.￿

Step 2: Make sure the Enclosure is on a level surface. Extend T-bars and adjust them to 3/4" from the bottom of the T. See figure 1. If the Enclosure is not at proper height, adjustments can be made by loosening and moving the T bars to the appropriate height.

T Bars

 

Figure 1

Level Surface

 

3/4"

Step 3: Remove one 2x2 or 2x4 ceiling tile from your ceiling grid.￿

Step 4: Make a 6" x 8" cut in the center of the selected tile. See figure 2.

Installation of the WLANE-C

Step 5: Place enclosure through the hole and make sure the T- bars are resting on the Ts. See figure 3.

 

 

8"

T Braces

 

21"

6"

21"

2'

T Bars

8"

 

 

 

8"

 

 

CeilingTile

4'

 

 

 

 

Figure 3

Step 6: The Enclosure should be about 1/4" below the tile. See figure 4.

CeilingTile

 

 

 

8"

 

21"

6"

21"

2'

8"

 

 

8"

 

 

4'

 

Figure 2

WLANE-C Installation

6

1/4"

2'

CeilingTile

4'

Figure 4

WLANE-C Installation 7

Page 4
Image 4
Cisco Systems 1200 manual Installation of the WLANE-C, T Bars, Level Surface