C H A P T E R 2

Preparing to Install the Cisco AS5350XM

Universal Gateway

This chapter describes the tasks you must perform before you begin to install the Cisco AS5350XM universal gateway and includes the following sections:

Safety Recommendations, page 2-1

Required Tools and Equipment, page 2-3

Preparing to Connect to a Network, page 2-3

Safety Recommendations

Any device that uses electricity must be handled carefully; follow these guidelines to ensure general safety:

Keep the chassis area clear and dust-free during and after installation.

Put the removed chassis cover in a safe place.

Keep tools away from walk areas where you and others could fall over them.

Do not wear loose clothing that could get caught in the chassis. Fasten your tie or scarf and roll up your sleeves.

Wear safety glasses if you are working under any conditions that might be hazardous to your eyes.

Do not perform any action that creates a potential hazard to people or makes the equipment unsafe.

Warning Ultimate disposal of this product should be handled according to all national laws and regulations. Statement 1040

Maintaining Safety with Electricity

Warning Before working on equipment that is connected to power lines, remove jewelry (including rings, necklaces, and watches). Metal objects will heat up when connected to power and ground and can cause serious burns or weld the metal object to the terminals. Statement 43

Follow these guidelines when you work on equipment powered by electricity.

Cisco AS5350XM Universal Gateway Chassis Installation Guide

 

OL-6417-02

2-1

 

 

 

Page 1
Image 1
Cisco Systems AS5350XM manual Safety Recommendations, Maintaining Safety with Electricity